-- card: 69080 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Troubleshooting 1 -- part 20 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=3 top=14 right=37 bottom=277 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 14 -- style flags: 8960 -- line height: 18 -- part name: Contents Main Head -- part 22 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 23 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=84 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 24 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part contents for card part 20 ----- text ----- Troubleshooting -- part contents for card part 23 ----- text ----- You add task information, but the schedule doesn’t change. -- part contents for background part 7 ----- text ----- Display all dates around task boxes in the Schedule Chart, or uncover their columns in the Project Table. Trace the path through the dates to see if it makes sense. Check the start and finish time of each task by displaying hours and minutes along with dates as attributes in the Schedule Chart. A 1-day task starts and ends on the same date, which may be confusing if the dates are displayed without the time of day. -- part contents for card part 22 ----- text ----- 1 of 6 -- part contents for background part 6 ----- text ----- Verify that AutoCalc is on. This command has a check mark beside it in the Dates menu when it is on. To be sure that all subproject information has been integrated into the master project, use Consolidate Project Family from the Dates menu. -- part contents for card part 24 ----- text ----- Dates don’t seem right.